Don't pay twice for the same data checks.
Do you hold ISO 14001, ISO 50001, or FPC certificates? We leverage your existing audits to drastically reduce the time and cost of verifying your CPR 3+ Verified™ declaration.
Select your active certificates:
Select certificates to see impact.
Evidence Recognition Matrix
See which verification requirements you have already "passed" thanks to your existing certificates.
| Verification Area | FPC Factory Production Control |
ISO 50001 Energy Management |
ISO 14001 / EMAS Environmental Mgmt |
|---|---|---|---|
| Recipes (BOM) Raw material quantities for Module A1 |
Full Compliance | - | - |
| Energy Consumption Electricity, Gas, Fuels (Module A3) |
Partial | Full Compliance | Partial |
| Production Waste Waste quantities and codes (Module A3) |
- | - | Full Compliance |
| Energy Origin Guarantees of Origin (GoO) |
- | Full Compliance | Partial |
Choose Your Implementation Path
The procedure differs depending on whether you are creating an EPD from scratch or have an active declaration.
I am creating a new EPD
The optimal path. We combine the declaration creation process with on-site verification during your scheduled annual FPC audit.
I have an EPD, I want CPR 3+
Fast track for holders of valid EPDs. We rely on "Gap Analysis".
Validity & Surveillance Cycle
Standard EPDs are static for 5 years. EPD+ is dynamic, linked to your active management systems.
Synchronization Rule
The EPD+ mark remains valid as long as your underlying FPC / ISO certificates are active. If your ISO 14001 certificate expires or is withdrawn, the verification status in the Registry is automatically suspended.
Annual Maintenance (Low Burden)
Unlike full LCA recalculation, EPD+ requires only a simple Annual Declaration during your standard surveillance audit: "No significant changes to energy mix or suppliers."
Check your savings potential
Contact us with your current ISO/FPC certificates to get a quote.